Validated decision path

Type 1 design evidence only

The published schema calculates “Type 1 design evidence only” for this decision path. 8 decision-driving facts are shown below. The result is bound to published schema version 2026.07.30.

01

Facts that drive this result

Examination targetType 1
Proposed Type 2 period startSeptember 4, 2026
Proposed Type 2 period endSeptember 4, 2026
Management checked how the population was generated and whether it is completeNo
Any sample basis used for examination preparation was confirmed with the CPA firmNo
Reviewed items are cross-referenced to preserved evidenceNo
Management found one or more deviations or unexplained itemsNo
An appropriate management reviewer completed the internal reviewNo
Review point
Calculated result

Type 1 design evidence only

Operating-effectiveness preparation statusType 1 design evidence only

02

Rules and next steps

Review

For a proposed Type 1 engagement, organize design and implementation evidence

For a proposed Type 1 engagement, organize design and implementation evidence as of the agreed date; operating-effectiveness testing over a period belongs to Type 2.

AICPA SOC 2 reporting guidance — Type 1 as-of date

Legal sources carried by this release

SOC 2® examination preparation — operating-effectiveness rehearsal

This is a validated example path through a published schema. The result applies only to the facts shown and is not legal advice.

AICPA SOC 2® Reporting Guide

Control design, operating effectiveness and examination evidence

Open source ↗
AICPA Maintaining High Standards for SOC Engagements

Type 1 as-of evidence and practitioner judgment

Open source ↗

Check your own facts

Run the interactive workflow

Records management's internal rehearsal of one control and organizes materials for CPA-firm testing. It does not prescribe the practitioner's procedures or sample and does not conclude that the control operated effectively for SOC 2 purposes.

Privacy preferences

Privacy policy