Item 105 Filing Subject To FCC Rule Delay — The delay must stay within the applicable FCC period… · Correct the planned FCC-rule delay period before…

The calculated result is “Item 105 Filing Subject To FCC Rule Delay”. Preserve the date of either a material or not-material determination.

Decision path1746E43EAASchema 1.0.0
Entered facts6
Registrant typeDomestic Form 8k Filer
Materiality assessmentDetermined Material
The U.S. Attorney General made the required delay determination and notified the SEC in writingNo
47 CFR 64.2011 requires this registrant to delay public disclosureYes
SEC delay correspondence submitted through EDGAR by the ordinary Item 1.05 due dateYes
The planned delay stays within the FCC period and Item 1.05 limitNo
Action required
Calculated result

Item 105 Filing Subject To FCC Rule Delay

Apply the published Item 1.05 logic to registrant status, materiality, filing timing, Attorney General or FCC delay, disclosure content, and amendment status. This scenario is distinct because it produces this exact combination of calculated result, active obligations, deadlines, and required evidence.

Published by ProseIDVersion 1.0.0
Rules activated5
Required

Preserve the date of either a material or not-material determination

Preserve the date of either a material or not-material determination.

Form 8-K Item 1.05(a)
Required

Complete “Material or reasonably likely material impact”

Complete “Material or reasonably likely material impact”.

Form 8-K Item 1.05(a)
Required

Complete “FCC-rule notification date, time, and zone”

Complete “FCC-rule notification date, time, and zone”.

Form 8-K Item 1.05(d); 47 CFR § 64.2011(b)(1)
Required

Correct the planned FCC-rule delay period before relying on Item 1.05(d)

Correct the planned FCC-rule delay period before relying on Item 1.05(d).

Form 8-K Item 1.05(d); 47 CFR § 64.2011(b)(1)
Review

The FCC-rule delay is temporary; preserve the notifications and monitor the Item…

The FCC-rule delay is temporary; preserve the notifications and monitor the Item 1.05 filing date.

Form 8-K Item 1.05(d); 47 CFR § 64.2011

Change the facts

A nearby path produces a different result.

SEC delay correspondence submitted through EDGAR by the ordinary Item 1.05 due dateYes → No

Result becomesComplete FCC Delay Notice Or File Item 105

Inspect the changed path →

Published legal basis

Sources carried by this schema release.

The calculated path is bound to the cited version and sources. It is general information, not a substitute for advice on facts or law outside the schema.

Use your facts

Run the actual workflow.

This page shows one calculated path. Open the maintained workflow to answer with your own facts and, when needed, create a version-bound audit record.