Consumer contract decision

Verify The Selected Article 16 Exception — Article 16 Exception: Rapidly Perishable Goods · Date withdrawal was requested becomes required

The calculated result is “Verify The Selected Article 16 Exception”. Use the legally relevant receipt date; split, multiple, and recurring deliveries can use a different Article 9 start point.

Decision pathE08BE6137ESchema 2026.06.19
Entered facts6
The contract is within the Consumer Rights Directive withdrawal regimeYes
The applicable Member State implementation has been checkedYes
Article 16 exceptionRapidly Perishable Goods
Withdrawal requested by consumerYes
Withdrawal was communicated within the applicable periodNo
Contract typeGoods
Action required
Calculated result

Verify The Selected Article 16 Exception

Apply the published EU withdrawal baseline to the contract type, notice history, exception, return status, and online-withdrawal steps entered here. This scenario is distinct because it produces this exact combination of calculated result, active obligations, deadlines, and required evidence.

Published by ProseIDVersion 2026.06.19
Rules activated3
Required

Use the legally relevant receipt date; split, multiple, and recurring deliveries…

Use the legally relevant receipt date; split, multiple, and recurring deliveries can use a different Article 9 start point.

Directive 2011/83/EU Art. 9(2)(b)
Review

An Article 16 exception has been selected. Verify the exact legal conditions…

An Article 16 exception has been selected. Verify the exact legal conditions before treating the contract as exempt.

Directive 2011/83/EU Art. 16
Required

Complete “Withdrawal was communicated within the applicable period”

Complete “Withdrawal was communicated within the applicable period”.

Directive 2011/83/EU Arts. 9–11

Change the facts

A nearby path produces a different result.

Article 16 exceptionRapidly Perishable Goods → None

Result becomesWithdrawal Appears Outside The Entered Period

Inspect the changed path →

Published legal basis

Sources carried by this schema release.

The calculated path is bound to the cited version and sources. It is general information, not a substitute for advice on facts or law outside the schema.

Use your facts

Run the actual workflow.

This page shows one calculated path. Open the maintained workflow to answer with your own facts and, when needed, create a version-bound audit record.