Consumer contract decision

Complete Directive Scope Assessment — The ordinary withdrawal period may be extended… · Consumer was not informed of the right: the 14-day…

The calculated result is “Complete Directive Scope Assessment”. Complete and confirm the Consumer Rights Directive scope assessment.

Decision path8086861EB5Schema 2026.06.19
Entered facts7
The contract is within the Consumer Rights Directive withdrawal regimeNo
The applicable Member State implementation has been checkedYes
Article 16 exceptionNone
Withdrawal requested by consumerNo
Withdrawal was communicated within the applicable periodYes
Contract typeDigital Content
Consumer was informed of the 14-day right before purchaseNo
Action required
Calculated result

Complete Directive Scope Assessment

Apply the published EU withdrawal baseline to the contract type, notice history, exception, return status, and online-withdrawal steps entered here. This scenario is distinct because it produces this exact combination of calculated result, active obligations, deadlines, and required evidence.

Published by ProseIDVersion 2026.06.19
Rules activated3
Required

Complete and confirm the Consumer Rights Directive scope assessment

Complete and confirm the Consumer Rights Directive scope assessment.

Directive 2011/83/EU Arts. 3–4
Required

For services and non-tangible digital content, the withdrawal period normally…

For services and non-tangible digital content, the withdrawal period normally starts when the contract is concluded.

Directive 2011/83/EU Art. 9(2)(a), (c)
Review

Consumer was not informed of the right: the 14-day window extends by up to 12…

Consumer was not informed of the right: the 14-day window extends by up to 12 months.

Directive 2011/83/EU Art. 10

Change the facts

A nearby path produces a different result.

The contract is within the Consumer Rights Directive withdrawal regimeNo → Yes

Consumer was informed of the 14-day right before purchaseNo → Yes

Result becomesNo Withdrawal Request Recorded

Inspect the changed path →

Published legal basis

Sources carried by this schema release.

The calculated path is bound to the cited version and sources. It is general information, not a substitute for advice on facts or law outside the schema.

Use your facts

Run the actual workflow.

This page shows one calculated path. Open the maintained workflow to answer with your own facts and, when needed, create a version-bound audit record.